VORSCHAU

PRESSETERMINE

AKTUELLES PRESSEFOTO



WETTER
Graz: bedeckt
24°
Innsbruck: Regen
22°
Linz: Regen
22°
Wien: bedeckt
20°
© wetter.net

Stadtname / PLZ

AKTIENKURSE
 
ADHOC
Mi, 23.10.2024 10:28
Meldung drucken Artikel weiterleiten
pta20241023008
Business news for the stock market
Pressefach Pressefach

ADX Energy Ltd.: Update Lichtenberg-1 Gas Exploration Well

Operations Report No. 3 - Currently drilled depth is 2140 meters
Location of the LICHT-1 gas exploration well and the Anshof-2A oil appraisal well; ADX Energy Ltd.
Location of the LICHT-1 gas exploration well and the Anshof-2A oil appraisal well; ADX Energy Ltd.
[ Report ]

Wien (pta008/23.10.2024/10:28) - Key points

* The Lichtenberg-1 ("LICHT-1") gas exploration well, located in the ADX-AT-I licence in Upper Austria was spudded at 07:00 am Central European Time on the 26th of September 2024. The RED Drilling & Services GmbH (RED) E-202 rig is being used to drill the well. ADX is the operator and will retain a 50% economic interest in the well and the MND Investment Area after completion of earn in obligations by MND. ADX will retain a 100% interest in the remainder of the ADX-AT-I licence.
* At 6:00 am CET on the 21st of October 2024 the status of well operations was drilling ahead in 6 inch hole at 2140 metres measured depth (MD). Future operations are drilling to the total depth and logging the well.
* Previous operations since last report includes the logging of the well in 8 ½ inch hole, running and cementing 7 inch casing, setting up for the new 6 inch hole size, drilling out of the casing shoe and drilling ahead in 6 inch hole to the current depth.
* The LICHT-1 well is targeting an Upper Oligocene sandstone reservoir as well as two slightly shallower and geologically similar reservoirs. The targeted sandstone reservoirs can be highly productive based on offset production wells in the area. The LICHT-1 well is expected to take approximately 30 days to drill. The first Oligocene reservoirs are expected after around 2000 metres MD, with the main target reservoir expected from approximately 2500 metres MD. The well total depth is approximately 2900 metres MD.
* There are multiple, similar and close by follow-up prospects to Lichtenberg which are also covered by high quality 3D seismic. These drilling targets, if successful, would allow ADX and its partner to develop a large reserve base with long term gas production (refer to Lichtenberg Prospect Summary in Appendix 1).
* The next weekly Operations Report will be provided on 29th of October 2024.

For more details please see the PDF file.

(Ende)

Aussender: ADX Energy Ltd.
Ölzeltgasse 3/8
1030 Wien
Österreich
Ansprechpartner: Vesna Blazevic
Tel.: +43 676 6893465
E-Mail:
Website: www.adx-energy.com
ISIN(s): AU000000ADX9 (share)
Börsen: open market (free market) in Frankfurt, free market in Hamburg, free market in Munich, free market in Stuttgart; open market in Berlin, Tradegate
Weitere Handelsplätze: Australian Securities Exchange (ASX), Sydney
ADX Energy Ltd.
   
Wie fanden Sie diese Meldung?
Weitersagen
likes dislike Share Share |
Social Media
ETARGET

FOCUSTHEMA


SPECIALS


Werbung
middleAdvertising